30+
Plants
Hinduja Renewables Energy Private Limited (HREPL) is committed to partnering in India’s quest for leadership in sustainable energy and self-reliance. Hinduja Renewables is an independent, future-facing power producer with a vision to grow through both organic and inorganic means in renewable energy generation and emerging sustainable energy technologies.
Plants
Reduction in Carbon emissions till date
Solar Energy Produced till date
RESCO (Renewable Energy Services/Supply Company) Model revolves around the pay- as-you-save from solar energy. RESCO Model is also called the BOOT (Build-Own-Operate-Transfer) Model. Hinduja Renewables has expertise in building projects under the RESCO Model. The consumer has to execute a Power Purchase Agreement (PPA) for a period ranging from 15 to 25 years.
Open Access Model makes use of the open-access program of the state discoms which allows the solar power producer to sell solar energy at a remote location from the solar plant by using the Distribution Company (Discom) electricity grid infrastructure. A Power Purchase Agreement (PPA) is signed with the consumer to supply power through this model. The meter reading and billing units here are approved by the State Discom.
In the Group Captive Scheme, Hinduja Renewables will develop a solar plant to feed solar energy to multiple consumer locations in the same state. The consumer here needs to maintain 26% equity in the Special Purpose Vehicle created for this project and consume at least 51% of electricity from the project. This model is an extension of the Open Access Policy. This project is executed through a Power Purchase Agreement (PPA) and the Share Purchase Agreement (SPA).
Capacity: | 55 MWp |
Location: | Rawra, Rajasthan |
Commissioning Date: | February 2013 |
Read More |
Capacity: | 5.07 MWp |
Location: | Rawra, Jodhpur, Rajasthan |
Commissioning Date: | January 2012 |
Read More |
Capacity: | 23 MWp |
Location: | Gajner, Bikaner, Rajasthan |
Commissioning Date: | January 2013 |
Read More |
Capacity: | 3 MWp |
Location: | Pantnagar, Uttarakhand |
Commissioning Date: | March 2019 |
Read More |
Capacity: | 2.17 MWp |
Location: | Hosur, Tamil Nadu |
Commissioning Date: | March 2017 |
Read More |
Hinduja Renewables Energy Pvt Ltd.
Unit No 1, Ground Floor, Boston House,
Suren Rd, Gundavali, Andheri East, Mumbai, Maharashtra 400053
022 6787 9999